Photo showing potroom 2C looking west showing placing of precast air duct partition walls and concrete fill in foreground and precast air duct covers in background, sub slabs and finished floor along sides of building.
Photo showing potroom 2C looking west showing placing of precast air duct partition walls and concrete fill in foreground and precast air duct covers in background, sub slabs and finished floor along sides of building.
Photo showing Wharf Fire (Kitimat Wharf) which belongs to Alcan. The part that had the fire was a storage bldg. used when the boats docked with supplies for both Kitimat/Kemano. Also, part of the wharf was taken and both the wharf and storage bldg. where not replaced.1960s
Photo showing Wharf Fire (Kitimat Wharf) which belongs to Alcan. The part that had the fire was a storage bldg. used when the boats docked with supplies for both Kitimat/Kemano. Also, part of the wharf was taken and both the wharf and storage bldg. where not replaced.1960s
photo showing view looking view behind the wharf caissons looking north showing placing of sand blanket over the rock backfill at right of the outlet of the Dredge Pipe at left.
photo showing view looking view behind the wharf caissons looking north showing placing of sand blanket over the rock backfill at right of the outlet of the Dredge Pipe at left.
Photo showing view of the temporary wharf area looking southeast, scow grid in front of crane at elft, cement silos centre and transit ware-house at right.
Photo showing view of the temporary wharf area looking southeast, scow grid in front of crane at elft, cement silos centre and transit ware-house at right.
Photo showing view looking toward site of Pernament Wharf from south dike of graving dock, dredge and dragon line excavating channel from graving dock to deep water, truck dumping gravel for foundation blanket into bottom dump scow.
Photo showing view looking toward site of Pernament Wharf from south dike of graving dock, dredge and dragon line excavating channel from graving dock to deep water, truck dumping gravel for foundation blanket into bottom dump scow.
Photograph of an aerial of the Alcan smelter wharf area. Wharf area is in the front, and vehicles are parked there. Alcan beach is further back. The smelter is in the background. Gold Max Patzelt embossment is on the bottom right corner.
Photograph of an aerial of the Alcan smelter wharf area. Wharf area is in the front, and vehicles are parked there. Alcan beach is further back. The smelter is in the background. Gold Max Patzelt embossment is on the bottom right corner.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.