Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
General view of the site looking north showing the Smelter at upper centre, and the Graving Dock and Wharf at lower centre. Taken from a helicopter on Wednesday, April 1, 1953.
General view of the site looking north showing the Smelter at upper centre, and the Graving Dock and Wharf at lower centre. Taken from a helicopter on Wednesday, April 1, 1953.
Book titled "Aluminum Company of Canada, Ltd. Employee Training Division Montreal Trainee Manual", with a dark green cover, and an image of an aluminum ingot in the centre. Includes a letter from P. E. Radley to Mr. W.S. Mosher, explaining that this manual was sent as a sort of "guidebook" for British Columbia Employees, instead of a tour of the Eastern Canada plants.
Book titled "Aluminum Company of Canada, Ltd. Employee Training Division Montreal Trainee Manual", with a dark green cover, and an image of an aluminum ingot in the centre. Includes a letter from P. E. Radley to Mr. W.S. Mosher, explaining that this manual was sent as a sort of "guidebook" for British Columbia Employees, instead of a tour of the Eastern Canada plants.