Photograph of an aerial of the Alcan Plant and Kitimat River Facility. Alcan Plant is visible above and Kitimat River delta is below.
Notes
Back of photo has 2 dates, Jan 23 1985 and Jan 23 1986. The 1986 date is a sticker add on, while the 1985 date is stamped on. The 1985 date is believed to be correct.
Photograph of an aerial view the the Alcan plant and Kitimat River Delta. Alcan plant is visible above while the delta is below.
Notes
Back of photo has 2 dates, Jan 23 1985 and Jan 23 1986. The 1986 date is a sticker add on, while the 1985 date is stamped on. The 1985 date is believed to be correct.
Photograph of aerial of the Kitimat River Delta, Alcan Plant and part of the Ocelot Operation. Alcan Plant is visible above, Kitimat River Delta below, and Ocelot is to the right.
Photograph of aerial of the Kitimat River Delta, Alcan Plant and part of the Ocelot Operation. Alcan Plant is visible above, Kitimat River Delta below, and Ocelot is to the right.
Notes
Back of photo has 2 dates, Jan 23 1985 and Jan 23 1986. The 1986 date is a sticker add on, while the 1985 date is stamped on. The 1985 date is believed to be correct.
Photograph of an aerial of the harbour facilities at Kitimat, BC. The Alcan plant is visible above it, and the Kitimat river delta is below.
Notes
Back of photo has 2 dates, Jan 23 1985 and Jan 23 1986. The 1986 date is a sticker add on, while the 1985 date is stamped on. The 1985 date is believed to be correct.
Photo showing view looking north west showing coal and coke bine adjacent to the carbon paste plant with truck dumping coke into hopper for feeding into the plant.
Photo showing view looking north west showing coal and coke bine adjacent to the carbon paste plant with truck dumping coke into hopper for feeding into the plant.
Photo showing view of the Carbon Paste Plant looking eat, smoke from stack showing first equipment in operation, erection of trusses for Conveyor C20 in progress.
Photo showing view of the Carbon Paste Plant looking eat, smoke from stack showing first equipment in operation, erection of trusses for Conveyor C20 in progress.
Photo showing general view of the site of Potlines #3 and 4 looking south east, Moore creek channel in foreground and dredge pipe discharging at left centre.
Photo showing general view of the site of Potlines #3 and 4 looking south east, Moore creek channel in foreground and dredge pipe discharging at left centre.
Photo showing steel transformers and other machinery in storage yard during winter with construction offices on site incluidng storage buildings and potrooms.
Photo showing steel transformers and other machinery in storage yard during winter with construction offices on site incluidng storage buildings and potrooms.