Photo depicts the permanent Kemano townsite at Camp No. 5. View is looking towards beach. Seen on the left are permanent homes for powerhouse staff. On the right are the temporary buildings known as quonset huts used during the construction years as crew quarters.
Photo depicts the permanent Kemano townsite at Camp No. 5. View is looking towards beach. Seen on the left are permanent homes for powerhouse staff. On the right are the temporary buildings known as quonset huts used during the construction years as crew quarters.
Notes
Title based on content of photograph. -- Alcan ID No. 2KR-298. -- Permanent housing construction began in 1957. Alcan Collection
Photograph of clearing timber for transmission line just back of camp 5 at Kemano. Logs are being loaded onto a truck with a crane. Five men can be seen working, one in the crane. There is snow on the ground and trees in the background.
Kemano Timber Limited photos. The President and CEO was Ernest G. McCorkell.
Custodial History
Photos donated by James (Jim) Stewart.
Scope and Content
Photograph of clearing timber for transmission line just back of camp 5 at Kemano. Logs are being loaded onto a truck with a crane. Five men can be seen working, one in the crane. There is snow on the ground and trees in the background.
Photograph of hoist house and line clearing up the mountain. Tower in front of clearing has a sign that reads "Aerial Tramway". Powerline pole is to the right of the tower. More poles are behind the Hoist House. The back of a vehicle can be seen peeking out on the left in front of the hoist house.
Kemano Timber Limited photos. The President and CEO was Ernest G. McCorkell.
Custodial History
Photos donated by James (Jim) Stewart.
Scope and Content
Photograph of hoist house and line clearing up the mountain. Tower in front of clearing has a sign that reads "Aerial Tramway". Powerline pole is to the right of the tower. More poles are behind the Hoist House. The back of a vehicle can be seen peeking out on the left in front of the hoist house.
Photograph of clearing and burning for transmission line between camp 5 and 6 at Kemano. Vehicles on road in the centre, and buildings are on the left. In the back smoke can be seen, and a crane is visible in front of it. Trees and mountains in background. Some snow on ground, as well as on mountain.
Kemano Timber Limited photos. The President and CEO was Ernest G. McCorkell.
Custodial History
Photos donated by James (Jim) Stewart.
Scope and Content
Photograph of clearing and burning for transmission line between camp 5 and 6 at Kemano. Vehicles on road in the centre, and buildings are on the left. In the back smoke can be seen, and a crane is visible in front of it. Trees and mountains in background. Some snow on ground, as well as on mountain.