Photo depicts Morrison-Knudsen Company superintendents in front of the office building at Camp No. 5, Kemano. Second from left, Thomas R. Hooper, Carpenter Superintendent.
Photo depicts Morrison-Knudsen Company superintendents in front of the office building at Camp No. 5, Kemano. Second from left, Thomas R. Hooper, Carpenter Superintendent.
Notes
Alcan ID No. 5793. -- Title based on contents of photograph. Alcan Collection
Photo showing there are two young boys sitting in their go-carts at the starting line. They are on a ramp, and there are young spectators behind and beside the two racers.
Photo showing there are two young boys sitting in their go-carts at the starting line. They are on a ramp, and there are young spectators behind and beside the two racers.
Image depicts a humorous reprieve certificate given to employees of the Alcan Project. The content also implies the hardships endured by the Morrison-Knudsen Company workers in Kemano.
Image depicts a humorous reprieve certificate given to employees of the Alcan Project. The content also implies the hardships endured by the Morrison-Knudsen Company workers in Kemano.
Notes
Title based on contents of text. Ernie Archer Collection
Photo depicts Glen Bates, Mechanical Installation Superintendent, Morrison-Knudsen Company, as he checks a gauge registering 1,850 pounds per square inch during pressure testing of Unit No. 6 scrollcase. Mr. Bates is wearing a hardhat with the M.K. logo on it. Alcan Collection
Photo depicts Glen Bates, Mechanical Installation Superintendent, Morrison-Knudsen Company, as he checks a gauge registering 1,850 pounds per square inch during pressure testing of Unit No. 6 scrollcase. Mr. Bates is wearing a hardhat with the M.K. logo on it. Alcan Collection
Max Patzelt seated at a table wearing a plaid buttonup shirt. The white banner above reads "Mission Impossible? Call Kitimat Photo Supply Ltd.". The wall to the right of Max is colored orange, and the wall behind him is colored green.
1 photograph : color ; 12.2 x 9.9 cm
1 negative : color ; 12.5 x 9.9 cm
Scope and Content
Max Patzelt seated at a table wearing a plaid buttonup shirt. The white banner above reads "Mission Impossible? Call Kitimat Photo Supply Ltd.". The wall to the right of Max is colored orange, and the wall behind him is colored green.
Photo depicts bulldozers placing fill in the south-west corner of the storage area, to the final elevation of 28.5 ft. View is looking north-east at storage area of hydraulic fill.
Photo depicts bulldozers placing fill in the south-west corner of the storage area, to the final elevation of 28.5 ft. View is looking north-east at storage area of hydraulic fill.
Notes
Title based on content of photograph. Alcan Collection 79.31.7
Photo depicts Kitimat Constructors Project Manager Hal Whiting on right, standing beside a unidentified man. Both watch the construction activity occurring down on the tidal flats in front of them, site for the smelter.
Photo depicts Kitimat Constructors Project Manager Hal Whiting on right, standing beside a unidentified man. Both watch the construction activity occurring down on the tidal flats in front of them, site for the smelter.
Notes
Title based on content of photograph. -- Photographed by the International Harvester Company, manufacturers of construction equipment purchased for the Project. Hal Whiting Collection 985.65.99
Photo depicts workers excavating for the construction of the alumina storage building.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-451. -- Sloping sides avoided cave-ins. -- Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.267
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-362. -- Messrs. Jenkinson, Wynne-Jones, and Hermann all work for Alcan Engineering under the Resident Engineer George Malby. Messrs. J.B. Whitton and Van Houten work for the consulting firm of Frederick R. Harris & Co. of New York, N.Y. Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.212