Photo showing view looking north eat, Kitimat River bridge showing east abutment forms in place and west span falsework. East abutment fill and piled river in left center.
Photo showing view looking north eat, Kitimat River bridge showing east abutment forms in place and west span falsework. East abutment fill and piled river in left center.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Photograph of Smelter Pot Lines. On back reads 'Pot Rooms One A,B,&C (r to l). These threee pot rooms comprise one pot line. There are two such pot lines nearing completion. When the project is completed there will be 8 pot lines or in other words 24 pot rooms, each 1200 feet long.'
Photograph of Smelter Pot Lines. On back reads 'Pot Rooms One A,B,&C (r to l). These threee pot rooms comprise one pot line. There are two such pot lines nearing completion. When the project is completed there will be 8 pot lines or in other words 24 pot rooms, each 1200 feet long.'
General view of the site looking north showing the Smelter at upper centre, and the Graving Dock and Wharf at lower centre. Taken from a helicopter on Wednesday, April 1, 1953.
General view of the site looking north showing the Smelter at upper centre, and the Graving Dock and Wharf at lower centre. Taken from a helicopter on Wednesday, April 1, 1953.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.