Photograph of view looking east showing progress of potline 2, alumina storage bins and sub-station 2. Area under construction, construction material in foreground.
Bud Powell is a longtime resident of Kitimat and former smeltersite resident. He worked for Alcan.
Custodial History
Donated by Bud Powell.
Scope and Content
Photograph of view looking east showing progress of potline 2, alumina storage bins and sub-station 2. Area under construction, construction material in foreground.
N/W corner of Smelter Site, looking east. North access road in left foreground. Area for service buildings in center foreground. Cold deck pile No. 1 in right foreground. Overburden disposal ramp in background.
N/W corner of Smelter Site, looking east. North access road in left foreground. Area for service buildings in center foreground. Cold deck pile No. 1 in right foreground. Overburden disposal ramp in background.
Photograph showing concrete being poured and slab finished for the first floor in the No.2 Commercial Building Note : formwork for colums and roof slab in background.
1 photograph :
b&w ; 18 x 12.5 cm
b&w ; 18 x 12.5 cm
Scope and Content
Photograph showing concrete being poured and slab finished for the first floor in the No.2 Commercial Building Note : formwork for colums and roof slab in background.
Photograph of 4-pole structure that will temporarily serve the electrical districtbution for the City Centre. Note the external steps on the South Side of the Alcan commecial building.
Photograph of 4-pole structure that will temporarily serve the electrical districtbution for the City Centre. Note the external steps on the South Side of the Alcan commecial building.
Photograph of smeltersite looking west from eastern boundary. Compacted gravel fill being placed. Note that the fill under the pipes at the centre is at final grade of 45' 6". Material, construction, and buildings visible in back.
Bud Powell is a longtime resident of Kitimat and former smeltersite resident. He worked for Alcan.
Custodial History
Donated by Bud Powell.
Scope and Content
Photograph of smeltersite looking west from eastern boundary. Compacted gravel fill being placed. Note that the fill under the pipes at the centre is at final grade of 45' 6". Material, construction, and buildings visible in back.