Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
View looking northwest of pile driving operations for timber bridge across Road "N" in Neighbourhood "C". Note Townsite Contractors lumber storage yard in background.
View looking northwest of pile driving operations for timber bridge across Road "N" in Neighbourhood "C". Note Townsite Contractors lumber storage yard in background.
Flood looking upstream of Neighbourhood C Drainage Canal from approx. station 25/00. Note silt etc. in canal. Section of canal in immediate foreground was cut to shape just prior to the flood.
Flood looking upstream of Neighbourhood C Drainage Canal from approx. station 25/00. Note silt etc. in canal. Section of canal in immediate foreground was cut to shape just prior to the flood.
Aerial view looking north across Neighbourhood C. showing Dyke and drainage ditch in the foreground. Note rock for cobble lining stock - piled along ditch.
Aerial view looking north across Neighbourhood C. showing Dyke and drainage ditch in the foreground. Note rock for cobble lining stock - piled along ditch.