Photograph of temporary weir in main drainage channel below Columbia Ave. bridge, taken on Saturday 23rd Nov after the heavy rain and snow. Note the debris on the structure and part of the bank scoured away. The flow of water cut down the bed of channel approximately 2' in this area.
Photograph of temporary weir in main drainage channel below Columbia Ave. bridge, taken on Saturday 23rd Nov after the heavy rain and snow. Note the debris on the structure and part of the bank scoured away. The flow of water cut down the bed of channel approximately 2' in this area.
Flood looking upstream of Neighbourhood C Drainage Canal from approx. station 25/00. Note silt etc. in canal. Section of canal in immediate foreground was cut to shape just prior to the flood.
Flood looking upstream of Neighbourhood C Drainage Canal from approx. station 25/00. Note silt etc. in canal. Section of canal in immediate foreground was cut to shape just prior to the flood.
Negatives showing large steel parts for the mill and other steel structures that were on the Eurocan site after roughly the first 1.5 years of construction.
Negatives showing large steel parts for the mill and other steel structures that were on the Eurocan site after roughly the first 1.5 years of construction.
Photograph of a heavy rainfall damaging the rivers and creeks overflowing their banks. Highway 25 between Kitimat and Terrace was cut off by a washout at Williams creek.
Photograph of a heavy rainfall damaging the rivers and creeks overflowing their banks. Highway 25 between Kitimat and Terrace was cut off by a washout at Williams creek.
Notes
Heavy rainfall over the past several days have damaged rivers and creeks to overflow their banks yesterday. Highway 25 between Terrace and Kitimat was cutoff by a washout at Williams Creek. In Kitimat, meanwhile several areas were reported underwater and dikes hard-pressed to contain the swollen Kitimat River.