Photograph showing one of the bridges on the No.2. Electrical Transmission Line to the Townsite. This bridge was swept away on the night of the 22nd and 23rd of November.
Photograph showing one of the bridges on the No.2. Electrical Transmission Line to the Townsite. This bridge was swept away on the night of the 22nd and 23rd of November.
Saska River Bridge. Length overall 177 feet, clear span 67 feet built by Survey Party in 2 1/2 days. 100 horses and mules crossed the following morning. Current 10 miles per hour.
Saska River Bridge. Length overall 177 feet, clear span 67 feet built by Survey Party in 2 1/2 days. 100 horses and mules crossed the following morning. Current 10 miles per hour.
Saskwa River Bridge. Length over all 177 feet, clear span 67 feet. Built by Survey Party in 2 1/2 days. 100 horses and mules crossed the following morning. Current 10 miles per hour.
Saskwa River Bridge. Length over all 177 feet, clear span 67 feet. Built by Survey Party in 2 1/2 days. 100 horses and mules crossed the following morning. Current 10 miles per hour.
Photograph of temporary weir in main drainage channel below Columbia Ave. bridge, taken on Saturday 23rd Nov after the heavy rain and snow. Note the debris on the structure and part of the bank scoured away. The flow of water cut down the bed of channel approximately 2' in this area.
Photograph of temporary weir in main drainage channel below Columbia Ave. bridge, taken on Saturday 23rd Nov after the heavy rain and snow. Note the debris on the structure and part of the bank scoured away. The flow of water cut down the bed of channel approximately 2' in this area.
Photograph of 4-pole structure that will temporarily serve the electrical districtbution for the City Centre. Note the external steps on the South Side of the Alcan commecial building.
Photograph of 4-pole structure that will temporarily serve the electrical districtbution for the City Centre. Note the external steps on the South Side of the Alcan commecial building.