Photo depicts a unidentified man sitting on the Nechako River bank watching the the activities of construction of the dam at the canyon. Right bank stripping and left bank tunnel haul road shown.
Photo depicts a unidentified man sitting on the Nechako River bank watching the the activities of construction of the dam at the canyon. Right bank stripping and left bank tunnel haul road shown.
Notes
Title based on content of photo. -- A rock dam was chosen for its ability to withstand earthquakes. Morrison-Knudsen Company Collection
Photograph of 4-pole structure that will temporarily serve the electrical districtbution for the City Centre. Note the external steps on the South Side of the Alcan commecial building.
Photograph of 4-pole structure that will temporarily serve the electrical districtbution for the City Centre. Note the external steps on the South Side of the Alcan commecial building.
Negatives showing the Nechako Reservoir, the Kenney Dam, & the Skins Lake Spillway which were built to create hydroelectric power to be used by the Alcan aluminum smelter in Kitimat. Also pictured is Des Lake, Alcan barge Tahtsa II at East Tahtsa, a view of the Entiako River as it enters the Nechako Reservoir, an underwater cutting barge, & Eurocan's logging operation at Andrews Bay on Ootsa Lake.
Negatives showing the Nechako Reservoir, the Kenney Dam, & the Skins Lake Spillway which were built to create hydroelectric power to be used by the Alcan aluminum smelter in Kitimat. Also pictured is Des Lake, Alcan barge Tahtsa II at East Tahtsa, a view of the Entiako River as it enters the Nechako Reservoir, an underwater cutting barge, & Eurocan's logging operation at Andrews Bay on Ootsa Lake.
Negatives showing the state of some of the machines and structures for the Eurocan Pulp & Paper Mill after approximately two years of site construction.
Negatives showing the state of some of the machines and structures for the Eurocan Pulp & Paper Mill after approximately two years of site construction.