Fonds consists of over 200 photograph slides and photograph negatives from 1952 & 1953. Images are of Caisson dock construction, wharf and smeltersite construction.
Approximately 200 photograph slides and photographs
History / Biographical
Fred DeLory was an engineer on the Aluminum Company of Canada Ltd. smeltersite construction project f rom 1952 to 1953. He worked in an office that was located uphill from where the first pot lines were located. He went on to become a professor of civil engineering at the University of Toronto.
Scope and Content
Fonds consists of over 200 photograph slides and photograph negatives from 1952 & 1953. Images are of Caisson dock construction, wharf and smeltersite construction.
Photograph of smeltersite looking northeast, showing service buildings at left, rectifier building #102 and potline #2, pre-cast concrete yard in foreground.
Bud Powell is a longtime resident of Kitimat and former smeltersite resident. He worked for Alcan.
Custodial History
Donated by Bud Powell.
Scope and Content
Photograph of smeltersite looking northeast, showing service buildings at left, rectifier building #102 and potline #2, pre-cast concrete yard in foreground.
Photo depicts Kitimat Constructors Project Manager Hal Whiting on right, standing beside a unidentified man. Both watch the construction activity occurring down on the tidal flats in front of them, site for the smelter.
Photo depicts Kitimat Constructors Project Manager Hal Whiting on right, standing beside a unidentified man. Both watch the construction activity occurring down on the tidal flats in front of them, site for the smelter.
Notes
Title based on content of photograph. -- Photographed by the International Harvester Company, manufacturers of construction equipment purchased for the Project. Hal Whiting Collection 985.65.99