Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Photograph of an aerial view of the Eurocan, Ocelot, and Alcan docks, as well as the Alcan plant. Kitimat River estuary visible on bottom right.
Notes
Back of photo has 2 dates, Jan 23 1985 and Jan 23 1986. The 1986 date is a sticker add on, while the 1985 date is stamped on. The 1985 date is believed to be correct.
Photograph of an aerial view of the Eurocan, Ocelot, and Alcan docks, as well as the Alcan plant. Kitimat River estuary visible on bottom right.
Notes
Back of photo has 2 dates, Jan 23 1985 and Jan 23 1986. The 1986 date is a sticker add on, while the 1985 date is stamped on. The 1985 date is believed to be correct.
Photograph of an aerial view of the Eurocan, Ocelot, and Alcan docks, as well as the Alcan plant. Kitimat River estuary visible on bottom right.
Notes
Back of photo has 2 dates, Jan 23 1985 and Jan 23 1986. The 1986 date is a sticker add on, while the 1985 date is stamped on. The 1985 date is believed to be correct.
Photo showing inside of Casting building, on left is conveyor shute, conveyor for ingots and table for ingots to be stacked and wrapped for shipping on the right, holding bay.
Photo showing inside of Casting building, on left is conveyor shute, conveyor for ingots and table for ingots to be stacked and wrapped for shipping on the right, holding bay.