An aerial photo of the refining column and rest of the Ocelot site after the refining column was lifted by Partec Ocelot cranes and properly installed and bolted down.
An aerial photo of the refining column and rest of the Ocelot site after the refining column was lifted by Partec Ocelot cranes and properly installed and bolted down.
Aerial picture showing Riverlodge under construction. Note piles in place for Mess Hall and single room dormitories and grading being undertaken on Rec. Hall and Rec. Field sites
Aerial picture showing Riverlodge under construction. Note piles in place for Mess Hall and single room dormitories and grading being undertaken on Rec. Hall and Rec. Field sites