Photograph showing Haisla Bridge construction. Temp bridge with a vehicle on it is visible on the left. People working and machinery can be seen up on the bridge on the right.
Photograph showing Haisla Bridge construction. Temp bridge with a vehicle on it is visible on the left. People working and machinery can be seen up on the bridge on the right.
Notes
Photo is in two parts and taped together in the middle.
Aerial view of the Kitimat River Bridge site looking south showing falsework for steel erection. The building at lower left is the Club House of the Kitimat Rod and Gun Club.
Aerial view of the Kitimat River Bridge site looking south showing falsework for steel erection. The building at lower left is the Club House of the Kitimat Rod and Gun Club.
View showing railway track laying in progress across the site of potlines 3 and 4 into plant, Moore Creek Bridge in the Background Dec.17, 1954 Alcan Neg. # 28529
View showing railway track laying in progress across the site of potlines 3 and 4 into plant, Moore Creek Bridge in the Background Dec.17, 1954 Alcan Neg. # 28529
Photograph of view looking west across the Kitimat River bridge showing the west span erected and bolted, and the lower chord of the east span about halfway across the main channel.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of view looking west across the Kitimat River bridge showing the west span erected and bolted, and the lower chord of the east span about halfway across the main channel.
Photograph of view showing east span of Kitimat River bridge. Note very low water level (elevation 39.9) and recording gauge installed on downstream side of centre pier.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of view showing east span of Kitimat River bridge. Note very low water level (elevation 39.9) and recording gauge installed on downstream side of centre pier.