Aerial photo of the Kitimat river estuary showing Kitimat River, Kitimat Harbor, Minette Bay, and the Alcan company smelter site taken from the southwest looking northeast towards the Kitimat City Centre.
Aerial photo of the Kitimat river estuary showing Kitimat River, Kitimat Harbor, Minette Bay, and the Alcan company smelter site taken from the southwest looking northeast towards the Kitimat City Centre.
Photograph of an aerial view the the Alcan plant and Kitimat River Delta. Alcan plant is visible above while the delta is below.
Notes
Back of photo has 2 dates, Jan 23 1985 and Jan 23 1986. The 1986 date is a sticker add on, while the 1985 date is stamped on. The 1985 date is believed to be correct.
Photo depicts an aerial view of Kitimat. Seen is land cleared for Neighbourhood "D" and the Whitesail Neighbourhood under construction, right foreground. The Alcan smelter and channel are in the background.
Photo depicts an aerial view of Kitimat. Seen is land cleared for Neighbourhood "D" and the Whitesail Neighbourhood under construction, right foreground. The Alcan smelter and channel are in the background.
Notes
Title based on content of photograph. -- On the official "Town Plan for Kitimat, B.C." by Stein and Mayer & Whittlesey, Neighbourhood "D", the cleared area in the photo, was to have three elementary schools, and one junior and one senior high school. This neighbourhood was never constructed and was returned to bush.
Aerial photo of the Kitimat Region. Includes the Kitimat estuary, the Alcan smelter site and in the distance, the Kitimat City Centre. Taken from the southwest.
Aerial photo of the Kitimat Region. Includes the Kitimat estuary, the Alcan smelter site and in the distance, the Kitimat City Centre. Taken from the southwest.
Photo showing view of Kitimat River Bridge looking west, east pier in foreground showing whalers in place with sheet piling driven to grade, in center: pier, and on right: two bearing piles driven to required bearing. On left, sixty foot pile in place for splicing, temporary bridge crew completing placing rock in pier.
Photo showing view of Kitimat River Bridge looking west, east pier in foreground showing whalers in place with sheet piling driven to grade, in center: pier, and on right: two bearing piles driven to required bearing. On left, sixty foot pile in place for splicing, temporary bridge crew completing placing rock in pier.