Photo showing aerial view of the graving dock looking north showing caisson contruction nearing its final stages, the smelter site is in the background.
Photo showing aerial view of the graving dock looking north showing caisson contruction nearing its final stages, the smelter site is in the background.
Photo showing view of Kitimat River Bridge looking west, east pier in foreground showing whalers in place with sheet piling driven to grade, in center: pier, and on right: two bearing piles driven to required bearing. On left, sixty foot pile in place for splicing, temporary bridge crew completing placing rock in pier.
Photo showing view of Kitimat River Bridge looking west, east pier in foreground showing whalers in place with sheet piling driven to grade, in center: pier, and on right: two bearing piles driven to required bearing. On left, sixty foot pile in place for splicing, temporary bridge crew completing placing rock in pier.
Photograph of the caisson dock construction for the Alcan project in Kitimat. Caisson frames are in place, and trucks are visible working bellow. Photo is a panorama.
Frank G. Hendy was a former employee of Kitimat Construction during original building.
Custodial History
Photo was donated on August 3, 1984 for the 30th anniversary.
Scope and Content
Photograph of the caisson dock construction for the Alcan project in Kitimat. Caisson frames are in place, and trucks are visible working bellow. Photo is a panorama.