Photograph of Haisla Bridge construction. Looking east, showing bearing piles being driven in centre pier, and sheet piling in position for driving at east pier. Note traffic on temporary bridge.
Photograph of Haisla Bridge construction. Looking east, showing bearing piles being driven in centre pier, and sheet piling in position for driving at east pier. Note traffic on temporary bridge.
Photograph of Potline 2 looking south west from roof of the forge shop. Note purlin clips welded for roof deck. Column forms in place. Concrete being poured for top lift air duct entrance Potroom 2B. Rectified building #102 at right.
Photograph of Potline 2 looking south west from roof of the forge shop. Note purlin clips welded for roof deck. Column forms in place. Concrete being poured for top lift air duct entrance Potroom 2B. Rectified building #102 at right.