Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Saskwa River Bridge. Length over all 177 feet, clear span 67 feet. Built by Survey Party in 2 1/2 days. 100 horses and mules crossed the following morning, current 10 miles per hour.
Saskwa River Bridge. Length over all 177 feet, clear span 67 feet. Built by Survey Party in 2 1/2 days. 100 horses and mules crossed the following morning, current 10 miles per hour.
Saskwa River Bridge. Length over all 177 feet, clear span 67 feet. Built by Survey Party in 2 1/2 days. 100 horses and mules crossed the following morning. Current 10 miles per hour.
In 1899 J.S. O'Dwyer, engineer in charge of a Canadian Department of Railways and Canals survey party, found the bridge over the Suskwa near its Junction with the Bulkley washed away. Using the Indigigenous methods of the cantilever principle he and his men built a bridge 177 feet long, with a clear span of 67 feet, in just two days. The bridge was crossed successfully by loo horses and mules apparently at mile 4
Saskwa River Bridge. Length over all 177 feet, clear span 67 feet. Built by Survey Party in 2 1/2 days. 100 horses and mules crossed the following morning. Current 10 miles per hour.
In 1899 J.S. O'Dwyer, engineer in charge of a Canadian Department of Railways and Canals survey party, found the bridge over the Suskwa near its Junction with the Bulkley washed away. Using the Indigigenous methods of the cantilever principle he and his men built a bridge 177 feet long, with a clear span of 67 feet, in just two days. The bridge was crossed successfully by loo horses and mules apparently at mile 4
Saska River Bridge. Length overall 177 feet, clear span 67 feet built by Survey Party in 2 1/2 days. 100 horses and mules crossed the following morning. Current 10 miles per hour.
Saska River Bridge. Length overall 177 feet, clear span 67 feet built by Survey Party in 2 1/2 days. 100 horses and mules crossed the following morning. Current 10 miles per hour.
Saskwa River Bridge. Length over all 177 feet, clear span 67 feet. Built by Survey Party in 2 1/2 days. 100 horses and mules crossed the following morning. Current 10 miles per hour.
Saskwa River Bridge. Length over all 177 feet, clear span 67 feet. Built by Survey Party in 2 1/2 days. 100 horses and mules crossed the following morning. Current 10 miles per hour.
Aerial view of the smelter area looking north. Note rectifier buildings mainly closed in and roofing nearing completion. Potline footings are begining to extend east of the centre passageway.
Aerial view of the smelter area looking north. Note rectifier buildings mainly closed in and roofing nearing completion. Potline footings are begining to extend east of the centre passageway.