Photograph of looking north at coke calcining plant showing unloading hopper at left and concrete being placed at pier No.1. Cranes visible working. Lots of snow.
Bud Powell is a longtime resident of Kitimat and former smeltersite resident. He worked for Alcan.
Custodial History
Donated by Bud Powell.
Scope and Content
Photograph of looking north at coke calcining plant showing unloading hopper at left and concrete being placed at pier No.1. Cranes visible working. Lots of snow.
Photograph of Aerial View of Sandhill ; Service Centre ; Haisla Bridge ; Kitimat River ; Kitimat Liquid Air ; Bowbyes Cake ; Parks and Campgrounds ; Municipal ; Radley Park
Photograph of Aerial View of Sandhill ; Service Centre ; Haisla Bridge ; Kitimat River ; Kitimat Liquid Air ; Bowbyes Cake ; Parks and Campgrounds ; Municipal ; Radley Park
Slide showing NW view from smeltersite towards Clague Mountain. Building visible on left side, and mountain in the distance. Image is a double exposure, and trucks can be seen in the ghosted image.
James McNay was born in Ayrshire, Scotland, on January 31, 1907. Between 1951 and 1953, he worked in the payroll department for Alcan. He had to leave his wife Effie and his two young daughters, Margaret and Diane, aged 6 and 5 in 1951, at home in Surrey, B.C., during his 3-4 month stints in Kitimat. To fill some of his free time and show his family where he was and what Kitimat was like, he spent many hours walking in the area with a 35mm Kodak camera. He photographed the scenic beauty of the area and parts of the construction of both the smelters and the town. He died in Surrey on August 7, 1983.
Custodial History
Donated by Margaret McNay. Images were taken by her father and sent to their family in Surrey in the 1950s.
Scope and Content
Slide showing NW view from smeltersite towards Clague Mountain. Building visible on left side, and mountain in the distance. Image is a double exposure, and trucks can be seen in the ghosted image.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Photograph of Aerial View of Sandhill ; Service Centre ; Kitimat River ; Bowbyes Lake ; Alcan Road ; Railroad Line ; Business ; Industrial ; Kitimat Liquid Air
Photograph of Aerial View of Sandhill ; Service Centre ; Kitimat River ; Bowbyes Lake ; Alcan Road ; Railroad Line ; Business ; Industrial ; Kitimat Liquid Air
John Ware was a past employee of the Kitimat Town Planning Department (1957-1959). He was hired by Hollister Kent, Planning Director for Kitimat. During his two years here, Dr. ware designed the first Kitimat street signs, the Haisla Boulevard overpass, and the Hirsch Creek Park shelter centennial project (1858-1958). He was layed off when Alcan lost major Aluminum buyers and the town expansion halted, resulting in a cut back of Kirtimat employees. He then moved to the USA.
Custodial History
Donated by John Ware.
Scope and Content
Photographs of the Haisla Boulevard pedestrian walkway bridge. Photos include bridge before centre support was installed, and after.
Notes
Further info on the walkway bridge - the pedestrian overpass was designed by John Ware to carry people, heavy wet snow loads and walkway snow plow, with a large saftey factor. The central span was designed as the maximum length of concrete double 'Tee' beam that could be carried on an open flatbed railroad car through the Canadian Rocky Mountains. The pre-stressed central span was supported on each end by poured reinforced concrete cantilevers built clear of the multi-lane highway. Initial structural calculations were done out by the very capable Kitimat Town Engineer Graydon. His calculations were checked by Kitimat's consulting engineering firm in Vancouver. Ware's design and the engineer's calculations were then sent to a pre-stressed concrete manufacturer in Calgary. When the beam arrived it was properly installed between the two cantilevers, and metal handrails were added just before the winter snow arrived. The bridge was deseigned to self support without any needed centre support. However, when city officials saw the light looking long span walkway bridge they decided that it was too fragile and that a column must be placed at mid span to give it adequate support. This decision would result in a fatal vehicle accident, as wet snows caused a driver to lose control and crash into it.
John Ware was a past employee of the Kitimat Town Planning Department (1957-1959). He was hired by Hollister Kent, Planning Director for Kitimat. During his two years here, Dr. ware designed the first Kitimat street signs, the Haisla Boulevard overpass, and the Hirsch Creek Park shelter centennial project (1858-1958). He was layed off when Alcan lost major Aluminum buyers and the town expansion halted, resulting in a cut back of Kirtimat employees. He then moved to the USA.
Custodial History
Donated by John Ware.
Scope and Content
Photographs of the Haisla Boulevard pedestrian walkway bridge concept.
Preliminary sketch design for walkway bridge over 4 lane divided highway. Designed by Jack Ware in collaboration with:
Kitimat municipal structural engineer-Bryan Graydon
Kitimat municipal structural engineering consultants-Vancouver
Note
Center prestressed beam is supported by the cantilevered beams at each end
Prestressed beam was the longest beam that could be carried on a rail flatbed car across tocky mountains in 1958
Design of supports was simplified to round columns for ease of construction
Notes
Further info on the walkway bridge - the pedestrian overpass was designed by John Ware to carry people, heavy wet snow loads and walkway snow plow, with a large saftey factor. The central span was designed as the maximum length of concrete double 'Tee' beam that could be carried on an open flatbed railroad car through the Canadian Rocky Mountains. The pre-stressed central span was supported on each end by poured reinforced concrete cantilevers built clear of the multi-lane highway. Initial structural calculations were done out by the very capable Kitimat Town Engineer Graydon. His calculations were checked by Kitimat's consulting engineering firm in Vancouver. Ware's design and the engineer's calculations were then sent to a pre-stressed concrete manufacturer in Calgary. When the beam arrived it was properly installed between the two cantilevers, and metal handrails were added just before the winter snow arrived. The bridge was deseigned to self support without any needed centre support. However, when city officials saw the light looking long span walkway bridge they decided that it was too fragile and that a column must be placed at mid span to give it adequate support. This decision would result in a fatal vehicle accident, as wet snows caused a driver to lose control and crash into it.
Photograph of looking west toward site of laboratory bldg. 273. Area clearcut. Cars on road on background. Powerlines along road. Something red is circled on the picture. Coordinate stake?
Bud Powell is a longtime resident of Kitimat and former smeltersite resident. He worked for Alcan.
Custodial History
Donated by Bud Powell.
Scope and Content
Photograph of looking west toward site of laboratory bldg. 273. Area clearcut. Cars on road on background. Powerlines along road. Something red is circled on the picture. Coordinate stake?
Aerial view of the Kitimat River Bridge site looking East. The townsite camp can be seen at upper right. The building being erected at left centre on the riverbank is the clubhouse of the Kitimat Rod & Gun.
Aerial view of the Kitimat River Bridge site looking East. The townsite camp can be seen at upper right. The building being erected at left centre on the riverbank is the clubhouse of the Kitimat Rod & Gun.