Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Photograph showing one of the bridges on the No.2. Electrical Transmission Line to the Townsite. This bridge was swept away on the night of the 22nd and 23rd of November.
Photograph showing one of the bridges on the No.2. Electrical Transmission Line to the Townsite. This bridge was swept away on the night of the 22nd and 23rd of November.
View looking northwest of pile driving operations for timber bridge across Road "N" in Neighbourhood "C". Note Townsite Contractors lumber storage yard in background.
View looking northwest of pile driving operations for timber bridge across Road "N" in Neighbourhood "C". Note Townsite Contractors lumber storage yard in background.
View showing railway track laying in progress across the site of potlines 3 and 4 into plant, Moore Creek Bridge in the Background Dec.17, 1954 Alcan Neg. # 28529
View showing railway track laying in progress across the site of potlines 3 and 4 into plant, Moore Creek Bridge in the Background Dec.17, 1954 Alcan Neg. # 28529
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.