Photo depicts an aerial view of Kitimat, seen is land cleared for Neighbourhood "D" and the Whitesail neighbourhood under construction, right foreground. The Alcan smelter and channel are in the background.
Photo depicts an aerial view of Kitimat, seen is land cleared for Neighbourhood "D" and the Whitesail neighbourhood under construction, right foreground. The Alcan smelter and channel are in the background.
Notes
Title based on content of photograph. Max Patzelt Collection - 1998.1.8351
Photo depicts an aerial view of the powerhouse switchyard and entrance up to the 1600' level. The wide clearing on the right is the tram right-of-way. The powerhouse tailrace tunnel and channel and the access tunnel portal are in the centre, and the construction camp is on the left. Alcan Collection
Photo depicts an aerial view of the powerhouse switchyard and entrance up to the 1600' level. The wide clearing on the right is the tram right-of-way. The powerhouse tailrace tunnel and channel and the access tunnel portal are in the centre, and the construction camp is on the left. Alcan Collection
Photo depicts an aerial view of the smeltersite main camp showing married quarters, sternwheeler Delta King, hydraulic fill in progress, recreation building, hospital, power plant, sawmill and water tank.
Photo depicts an aerial view of the smeltersite main camp showing married quarters, sternwheeler Delta King, hydraulic fill in progress, recreation building, hospital, power plant, sawmill and water tank.
Notes
Title based on content of photograph. -- Alcan ID Numbers BC-2-243 and ACM-24311. Alcan Collection 78.11.32
Photo depicts an aerial view looking northwest of Smeltersite housing, the hospital on the beach, the school in the centre, and the seaplane landing ramp.
Photo depicts an aerial view looking northwest of Smeltersite housing, the hospital on the beach, the school in the centre, and the seaplane landing ramp.
Notes
Title based on content of photograph. -- Alcan ID No. J-43-1837. Kitimat Heritage Advisory Commission Collection. KMA No. P00209.jpg
Photo depicts the Bailey Bridge across the inner end of the access tunnel with form work in the background. View is from a high elevation under the roof looking northwest.
Photo depicts the Bailey Bridge across the inner end of the access tunnel with form work in the background. View is from a high elevation under the roof looking northwest.
Notes
Title based on content of photograph. Alcan Collection
Photo showing Columbia Bridge is coming down and will be out of service for about another month according to the municipal engineering department. The old stringers are to be removed Friday and following that the main culvert will be installed and the cavity filled and eventually paved. Kuldo Bridge is to get the same treatment once Columbia is back in use.
Current: 1960s
-District of Kitimat
-Miscellaneous
Scope and Content
Photo showing Columbia Bridge is coming down and will be out of service for about another month according to the municipal engineering department. The old stringers are to be removed Friday and following that the main culvert will be installed and the cavity filled and eventually paved. Kuldo Bridge is to get the same treatment once Columbia is back in use.
Photo depicts workers excavating for the construction of the alumina storage building.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-451. -- Sloping sides avoided cave-ins. -- Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.267
Photo depicts a general view along the transmission line. A shovel is excavating sand for the backfill, in the vicinity of Tower No. 352. Kitimat Bay and Valley are in the background.
Photo depicts a general view along the transmission line. A shovel is excavating sand for the backfill, in the vicinity of Tower No. 352. Kitimat Bay and Valley are in the background.
Notes
Title based on content of photograph. -- Alcan ID No. KR-962. Alcan Collection
Title based on content of photograph. -- Haisla Bridge, Kitimat's first permanent bridge was completed by the end of 1953 and officially opened in 1957. -- The cost was over one million dollars. District of Kitimat Collection. District of Kitimat Collection 987.10.2
Photo showing power distribution crew is shown above erecting new double-arm aluminum light standards along the centre island at the Haisla-Kuldo intersection. The standards, some double, others single, all equipped with mercury vapor lamps will light Haisla from the intersection to the bridge, Commercial for its full length and Kuldo from Haisla to Columbia. Bases for the standards were installed in late November but the poles, which were made elsewhere, did not arrive in Kitimat until last week.
Current: 1960s
-District of Kitimat
-Miscellaneous
Scope and Content
Photo showing power distribution crew is shown above erecting new double-arm aluminum light standards along the centre island at the Haisla-Kuldo intersection. The standards, some double, others single, all equipped with mercury vapor lamps will light Haisla from the intersection to the bridge, Commercial for its full length and Kuldo from Haisla to Columbia. Bases for the standards were installed in late November but the poles, which were made elsewhere, did not arrive in Kitimat until last week.
Photo depicts the dredge and dragline excavating the channel from the dock to deep water, a truck dumping gravel for the foundation blanket into the bottom of a dump scow. The view looks toward the construction site for the permanent wharf from the south dike of the graving dock, crew bunkhouses of Smeltersite in the background.
Photo depicts the dredge and dragline excavating the channel from the dock to deep water, a truck dumping gravel for the foundation blanket into the bottom of a dump scow. The view looks toward the construction site for the permanent wharf from the south dike of the graving dock, crew bunkhouses of Smeltersite in the background.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-320. Hal Whiting Collection 985.65.211