The crew of DC-3 casting machine raised the 15, 000 lb ingot containing the two millionth ton of aluminum production at Kitimat Works on October 14, 1966. Caption from article published in the Ingot. Asst. Works Manager T.L. "Bud" Gibson was on hand to congratulate DC-3 operator Manuel Trigo. Also shown in the photo from left are Bruno Unger, shift foreman, John Jeffrey, general foreman, Evaristo de Melo, asst. operator, Heinz Kaimbach, asst. op., Manuel DeCosta, shift foreman, Paul Loeffier, Op. slab saw, Mr. Gibson and Mr. Trigo; Casting Division Superintendent Jim Bell, Packaging and Shipping general foreman Bill Keith, day foreman Tony Coppens, Casting Superintendent Bob Reid, shift foreman Bernard Dicker, main. foreman Earl Welin and day foreman Helmut Benn. Dimensions of the ingot in the picture are 20 1/2" x 40" x 187". It weights 15, 147 lbs.
The crew of DC-3 casting machine raised the 15, 000 lb ingot containing the two millionth ton of aluminum production at Kitimat Works on October 14, 1966. Caption from article published in the Ingot. Asst. Works Manager T.L. "Bud" Gibson was on hand to congratulate DC-3 operator Manuel Trigo. Also shown in the photo from left are Bruno Unger, shift foreman, John Jeffrey, general foreman, Evaristo de Melo, asst. operator, Heinz Kaimbach, asst. op., Manuel DeCosta, shift foreman, Paul Loeffier, Op. slab saw, Mr. Gibson and Mr. Trigo; Casting Division Superintendent Jim Bell, Packaging and Shipping general foreman Bill Keith, day foreman Tony Coppens, Casting Superintendent Bob Reid, shift foreman Bernard Dicker, main. foreman Earl Welin and day foreman Helmut Benn. Dimensions of the ingot in the picture are 20 1/2" x 40" x 187". It weights 15, 147 lbs.
Photo showing construction underway on the new school board offices and board room in Terrace. The board got the green light for the building on December 14 after waiting since 1966 for permission to build.
Photo showing construction underway on the new school board offices and board room in Terrace. The board got the green light for the building on December 14 after waiting since 1966 for permission to build.
Photo showing the latest view of the hospital addition and psychiatric wing for Mills Memorial Hospital. The psychiatric wing is the one storey building in the foreground and the addition is between it and the existing building. The view is from Haughland Avenue.
Photo showing the latest view of the hospital addition and psychiatric wing for Mills Memorial Hospital. The psychiatric wing is the one storey building in the foreground and the addition is between it and the existing building. The view is from Haughland Avenue.
Photo showing crews busily working on the installation of the last pier for the new Skeena River bridge span. Work has been proceeding at a snail's pace for the past year but has improved in recent months. No completion date for the span has been set,
Photo showing crews busily working on the installation of the last pier for the new Skeena River bridge span. Work has been proceeding at a snail's pace for the past year but has improved in recent months. No completion date for the span has been set,
Photo showing Aristides (Ziggy) Monteilo operating the loader as Dave McLeod sat beind the wheel of the dump truck. Instructing the crew was Ed Zuchotzki.
Photo showing Aristides (Ziggy) Monteilo operating the loader as Dave McLeod sat beind the wheel of the dump truck. Instructing the crew was Ed Zuchotzki.