Photo depicts two barges moored in Douglas Channel and loaded with flat-top house sections for construction workers and their families.
Notes
Title based on content of photograph. -- Temporary housing destined for Kitimat was assembled at Vancouver Tug and Barge below the Lion's Gate Bridge in three sections, then barged to Kitimat - 10 houses or 30 sections on each barge. -- Electrician Bill Frahler wired approximately 2,000 houses in Kitimat camps and townsite between 1954 and 1958, working first for Johnson-Crooks then Straits Construction, both U.S. contractors. Pat Jimenez Collection
Photo depicts a tent with flat-top house assembly on a production line in West Vancouver for Johnson-Crooks Construction Corporation.
Notes
Title based on content of photograph. -- Slide No. 40 -- The circus tent assembly line was erected at Vancouver Tug and Barge below the Lion's Gate Bridge. Temporary housing destined for Kitimat was assembled there in three sections, then barged to Kitimat - 10 houses or 30 sections on each barge. -- Electrician Bill Frahler wired approximately 2,000 houses in Kitimat camps and townsite between 1954 and 1958, working first for Johnson-Crooks then Straits Construction, both U.S. contractors. Bill Frahler Collection 2003.32
6 Oct 1980
16 Apr 1981
4 May 1981
(3,10) Dec 1981
18 Jan 1982
8 Feb 1982
24 Aug 1982
17 Oct 1982
Physical Description
23 photograph prints : color
19 photograph prints : b&w
27 negatives
Custodial History
Photographs taken by Max Patzelt.
Scope and Content
Photographs showing interior and exterior views of different buildings on the Ocelot site.
Notes
Roll 5-(No5A,No7A,No8A), Roll 12-(No10,No15), Roll 15-No5, 81-12-(596,612,614,620,624), 82-01-702, 82-02-(737,740,743,790 to 793,795,796,801), Roll 33-(12,15,23,25,32,34), Roll 34-11, 82-10-(1176,1183,1187,1194,1195,1200 to 1203,1206,1208,1210,1211)