A drawing of three Alcan employees. The two on the right are men, and the individual on the left is a woman. The lady is holding a trophy (The Gold Quill Award of Excellence) with a feather in it, and there are certificates hanging behind the three workers in the drawing.
A drawing of three Alcan employees. The two on the right are men, and the individual on the left is a woman. The lady is holding a trophy (The Gold Quill Award of Excellence) with a feather in it, and there are certificates hanging behind the three workers in the drawing.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Photo showing Helge Ronneseth and Kurt Zeiner from Norway. Alcan employees who first heard of Kitimat from an early copy of the Northern Sentinel; arrived as crew members of S.S. Sun Karen
Photo showing Helge Ronneseth and Kurt Zeiner from Norway. Alcan employees who first heard of Kitimat from an early copy of the Northern Sentinel; arrived as crew members of S.S. Sun Karen