View showing railway track laying in progress across the site of potlines 3 and 4 into plant, Moore Creek Bridge in the Background Dec.17, 1954 Alcan Neg. # 28529
View showing railway track laying in progress across the site of potlines 3 and 4 into plant, Moore Creek Bridge in the Background Dec.17, 1954 Alcan Neg. # 28529
Photo showing view of Kitimat River Bridge looking west, east pier in foreground showing whalers in place with sheet piling driven to grade, in center: pier, and on right: two bearing piles driven to required bearing. On left, sixty foot pile in place for splicing, temporary bridge crew completing placing rock in pier.
Photo showing view of Kitimat River Bridge looking west, east pier in foreground showing whalers in place with sheet piling driven to grade, in center: pier, and on right: two bearing piles driven to required bearing. On left, sixty foot pile in place for splicing, temporary bridge crew completing placing rock in pier.
A man with a beard is handing out awards to four students. The first student in line is wearing a button up shirt with a striped shirt underneath. The second student is wearing glasses, and a checkered shirt with a vest overtop. The third student in line is a girl, and the last student is male.
A man with a beard is handing out awards to four students. The first student in line is wearing a button up shirt with a striped shirt underneath. The second student is wearing glasses, and a checkered shirt with a vest overtop. The third student in line is a girl, and the last student is male.