Alcan smelter employees returning to work after layoffs due to plant shut down caused by a rock slide in Kemano tunnel. (Rock Fall in the Kemano Power tunnel 65' long, 140' high, and 125 cubic yards of material) cut off power to Kitimat plant. Only after a dewatering of the tunnel, was power restored.
Alcan smelter employees returning to work after layoffs due to plant shut down caused by a rock slide in Kemano tunnel. (Rock Fall in the Kemano Power tunnel 65' long, 140' high, and 125 cubic yards of material) cut off power to Kitimat plant. Only after a dewatering of the tunnel, was power restored.
Alcan smelter employees returning to work after layoffs due to a tunnel closure in Kemano. (Rock fall in Kemano tunnel: 65' long, 140' high, 125 cubic yards of material had moved. Tunnel closure caused Alcan plant closure. Took a "dewatering" of tunnel to repair rock fall). Employee Eric Burr first through gate.
Alcan smelter employees returning to work after layoffs due to a tunnel closure in Kemano. (Rock fall in Kemano tunnel: 65' long, 140' high, 125 cubic yards of material had moved. Tunnel closure caused Alcan plant closure. Took a "dewatering" of tunnel to repair rock fall). Employee Eric Burr first through gate.
Jamieson came to Kitimat from Vancouver to work on the Alcan project in 1952. With his first pay cheque he bought a small "Pony Kodak" camera at the local store (Hudson Bay?), and started taking coloured slides of the Kitimat from 1952-1953. Left Kitimat at the end of August 1953 to move to Montreal.
Scope and Content
Slide of ferrying passengers across flooding Kitimat River.