Photograph looking North along little Wedeene Street showing Golden Construction housing units. The Municipal contractor is just completing the Laterals on this Street.
Photograph looking North along little Wedeene Street showing Golden Construction housing units. The Municipal contractor is just completing the Laterals on this Street.
Photo depicts high water conditions of Kitimat River at the south end of Service Centre. Near the water's edge in the background is a truck that has overturned.
Photo depicts high water conditions of Kitimat River at the south end of Service Centre. Near the water's edge in the background is a truck that has overturned.
Notes
Alcan ID No. J-2-183. -- Alcan Public Relations Department ID No. ICT 349-1. Photograph taken at 2:30 p.m. Truck overturned when the road gave way. River elevation was 50.45 feet and rose to a maximum of 51.1 feet at 6:30 p.m.
Photograph of Kitimat River flood. Taken shortly after 2:00 P.M., flooding conditions from Kitimat River topped the neighbourhood C dyke at station 3200. Two men are watching the water.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of Kitimat River flood. Taken shortly after 2:00 P.M., flooding conditions from Kitimat River topped the neighbourhood C dyke at station 3200. Two men are watching the water.
Photograph of Museum staff, board and others at tour of Kitselas Site. L-R : ?, Leona Littler, James Tirrul-Jones, ?, ?, Betty Turner, ???, Brian Mayhew, Joanne Monaghan, George MacDonald, ?? Brian Seymour.
Photograph of Museum staff, board and others at tour of Kitselas Site. L-R : ?, Leona Littler, James Tirrul-Jones, ?, ?, Betty Turner, ???, Brian Mayhew, Joanne Monaghan, George MacDonald, ?? Brian Seymour.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.