Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
DVD with blue and white label. Label reads 'Kitimat Works 50th Anniversary, 1954-2004, DVD, Produced by: Raising Cain Productions, All Rights Reserved, (copyright symbol) 2004, 1. Cynthia Carrol Message, 2. Ceremonial Ingot Pour, 3. Highlight Video, July 30 - August 1, 2004. DVD is in a black plastic case, Front of case is a photo of the Douglas Channel and the Aluminum Smelter.
DVD with blue and white label. Label reads 'Kitimat Works 50th Anniversary, 1954-2004, DVD, Produced by: Raising Cain Productions, All Rights Reserved, (copyright symbol) 2004, 1. Cynthia Carrol Message, 2. Ceremonial Ingot Pour, 3. Highlight Video, July 30 - August 1, 2004. DVD is in a black plastic case, Front of case is a photo of the Douglas Channel and the Aluminum Smelter.