Photo showing potlines 1 and 2 looking south, temporary concrete covers for air duct entrance and manholes in foreground and for footing in background. not transmission line clearing on mountainside.
Photo showing potlines 1 and 2 looking south, temporary concrete covers for air duct entrance and manholes in foreground and for footing in background. not transmission line clearing on mountainside.
Photograph showing Permanent Camp, 5 bunkhouses and cafeteria. Drill rig on green coke storage hole. Area in foreground to be hydraulic filled. North-South Mole at elev. 21.5 awash in immediate foreground. Taken from North-South Mole.
Photograph showing Permanent Camp, 5 bunkhouses and cafeteria. Drill rig on green coke storage hole. Area in foreground to be hydraulic filled. North-South Mole at elev. 21.5 awash in immediate foreground. Taken from North-South Mole.
Photograph of Smeltersite Bunkhouses. Back of the photograph reads: 'More bunkhouses & married quarters behind them. The dark building with the buses parked in front of it is the cafeteria, downstairs is the Hudson's Bay store & at the right hand and it is the Post Office.'
Photograph taken by Dave Geddes, Bank of Montreal, and given to Sylvia Anderson
Scope and Content
Photograph of Smeltersite Bunkhouses. Back of the photograph reads: 'More bunkhouses & married quarters behind them. The dark building with the buses parked in front of it is the cafeteria, downstairs is the Hudson's Bay store & at the right hand and it is the Post Office.'