Photograph of sawmill and water tank - Kitimat Temporary Camp
Notes
Red Binder - Found in Collection - 'If you hold this up to a light you will see the ridge outlined by the pencil line. The ridge plus the other area enclosed in the line is apporoximately the area of the future townsite."
Photo depicts flat-top temporary housing lining the hillside up to the Aluminum City Motel at the treeline. View is northwest. Grader on Kuldo Boulevard.
Photo depicts flat-top temporary housing lining the hillside up to the Aluminum City Motel at the treeline. View is northwest. Grader on Kuldo Boulevard.
Notes
Alcan Negative No. 29337. -- The circus tent assembly line was erected . Temporary housing destined for Kitimat was assembled at Vancouver Tug and Barge below the Lion's Gate Bridge in three sections, then barged to Kitimat - 10 houses or 30 sections on each barge. -- Electrician Bill Frahler wired approximately 2,000 houses in Kitimat camps and townsite between 1954 and 1958, working first for Johnson-Crooks then Straits Construction, both U.S. contractors.
Photo showing view of the temporary wharf area looking southeast, scow grid in front of crane at elft, cement silos centre and transit ware-house at right.
Photo showing view of the temporary wharf area looking southeast, scow grid in front of crane at elft, cement silos centre and transit ware-house at right.