8 photos of Alcan Engineering. 1) Looking East From Centre Passageway Bldg 7B 2) Completed Roof Fan Walking on Potroom 8B West 3) Looking West in Potroom 8B West from Column Line 12 4) Potroom 8B East Looking East from Centre Passageway 5) General View of Progress of Work in Potline 8A East 6) Potroom 8B East Looking East from Centre Passageway 7) Looking East from Centre Passageway Bldg 8A 8) Looking West from Centre Passageway Bldg 8A
8 photos of Alcan Engineering. 1) Looking East From Centre Passageway Bldg 7B 2) Completed Roof Fan Walking on Potroom 8B West 3) Looking West in Potroom 8B West from Column Line 12 4) Potroom 8B East Looking East from Centre Passageway 5) General View of Progress of Work in Potline 8A East 6) Potroom 8B East Looking East from Centre Passageway 7) Looking East from Centre Passageway Bldg 8A 8) Looking West from Centre Passageway Bldg 8A
Photo view of quarrying operations along the road between Anderson Creek and the Sandhill showing the loading of rock for use at the permanent wharf area.
Photo view of quarrying operations along the road between Anderson Creek and the Sandhill showing the loading of rock for use at the permanent wharf area.
Aerial photo of the Alcan aluminum smelter site, and the Douglas Channel. Taken from the north looking south. Note - bottom left corner is a portion of the Anderson Creek construction camp.
Aerial photo of the Alcan aluminum smelter site, and the Douglas Channel. Taken from the north looking south. Note - bottom left corner is a portion of the Anderson Creek construction camp.
Aerial photo of the Kitimat river estuary showing Kitimat River, Kitimat Harbor, Minette Bay, and the Alcan company smelter site taken from the southwest looking northeast towards the Kitimat City Centre.
Aerial photo of the Kitimat river estuary showing Kitimat River, Kitimat Harbor, Minette Bay, and the Alcan company smelter site taken from the southwest looking northeast towards the Kitimat City Centre.
Album showing Memorabilia of Alcan Kitimat Works employees. All the photos have been taken from the Ingots - unfortunately, not all have dates and years to identify the photos.
Album showing Memorabilia of Alcan Kitimat Works employees. All the photos have been taken from the Ingots - unfortunately, not all have dates and years to identify the photos.
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-362. -- Messrs. Jenkinson, Wynne-Jones, and Hermann all work for Alcan Engineering under the Resident Engineer George Malby. Messrs. J.B. Whitton and Van Houten work for the consulting firm of Frederick R. Harris & Co. of New York, N.Y. Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.212