Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
A Linhof large format camera. There is a view finder at side with rubber eye cup. A hand screw at the top. There are dials, buttons, and levers around the camera. At one side there is a door that reveals a bellows lens when opened. A tripod mount at the bottom. There is a leather strap attached on one side.
A Linhof large format camera. There is a view finder at side with rubber eye cup. A hand screw at the top. There are dials, buttons, and levers around the camera. At one side there is a door that reveals a bellows lens when opened. A tripod mount at the bottom. There is a leather strap attached on one side.