Photograph of the conference at the site between contractor John Bedard, right, and one of his sub-contractors was held last week as cement pouring of footings for 50 new units went on nearby. Twenty workmen are attempting to get structures roofed in before the arrival of snow. Scheduled opening date for the units is next June 1.
Photograph of the conference at the site between contractor John Bedard, right, and one of his sub-contractors was held last week as cement pouring of footings for 50 new units went on nearby. Twenty workmen are attempting to get structures roofed in before the arrival of snow. Scheduled opening date for the units is next June 1.
View looking northeast showing a group of the prototype houses being erected by Hullah Construction on Pintail and Partridge Streets - Kitimat Townsite.
In Klaus Mueller's possession when Engineering Depart. was dismantled.
Scope and Content
View looking northeast showing a group of the prototype houses being erected by Hullah Construction on Pintail and Partridge Streets - Kitimat Townsite.
Aerial view looking north at the plant site, with H.M.C.S. Sioux at the wharf. Tide elevation is approximately 2.5 feet, and the extent of the dredge cut in the harbour can be clearly seen.
In Klaus Mueller's possession when Engineering Depart. was dismantled.
Scope and Content
Aerial view looking north at the plant site, with H.M.C.S. Sioux at the wharf. Tide elevation is approximately 2.5 feet, and the extent of the dredge cut in the harbour can be clearly seen.