Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Photograph of showing the framing almost completed in Guest House No.2. Two men are visible working on it. Apartments visible behind, and townsite camp is to the left.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of showing the framing almost completed in Guest House No.2. Two men are visible working on it. Apartments visible behind, and townsite camp is to the left.
First alumina boat to discharge alumina for Alcan Smelter in Kitimat - arrived from Port Esquivel, Jamaica, in July 1954. Ship was named S.S. "Sun Karen".
First alumina boat to discharge alumina for Alcan Smelter in Kitimat - arrived from Port Esquivel, Jamaica, in July 1954. Ship was named S.S. "Sun Karen".