Photograph of completed paving on road between east passageway of potline 7 and Moore Creek railway bridge. Shoulder grading was later completed. Machinery and vehicles working. Powerlines on left side.
Bud Powell is a longtime resident of Kitimat and former smeltersite resident. He worked for Alcan.
Custodial History
Donated by Bud Powell.
Scope and Content
Photograph of completed paving on road between east passageway of potline 7 and Moore Creek railway bridge. Shoulder grading was later completed. Machinery and vehicles working. Powerlines on left side.
Photograph of aerial view looking northwest showing Moore Creek highway bridge and paved approaches. New Moore Creek bridge site at lower right. Moore Creek Falls visible. Various smeltersite buildings in foreground.
Bud Powell is a longtime resident of Kitimat and former smeltersite resident. He worked for Alcan.
Custodial History
Donated by Bud Powell.
Scope and Content
Photograph of aerial view looking northwest showing Moore Creek highway bridge and paved approaches. New Moore Creek bridge site at lower right. Moore Creek Falls visible. Various smeltersite buildings in foreground.
Photograph of view looking north, showing south approach to Moore Creek highway bridge at left. Vehicles on road and parked around. Buildings at right.
Bud Powell is a longtime resident of Kitimat and former smeltersite resident. He worked for Alcan.
Custodial History
Donated by Bud Powell.
Scope and Content
Photograph of view looking north, showing south approach to Moore Creek highway bridge at left. Vehicles on road and parked around. Buildings at right.
Photograph of one of the bridges on the No.2 electrical transmission line to the townsite. This bridge was swept away on the night of the 22nd and 23rd of Novemeber. Bridge is sitting in the river.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of one of the bridges on the No.2 electrical transmission line to the townsite. This bridge was swept away on the night of the 22nd and 23rd of Novemeber. Bridge is sitting in the river.
Photograph of view looking north showing construction of a temporary highway bridge over Anderson Creek to be used while the existing bridge is replaced by a new structure.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of view looking north showing construction of a temporary highway bridge over Anderson Creek to be used while the existing bridge is replaced by a new structure.
Photograph of view showing east span of Kitimat River bridge. Note very low water level (elevation 39.9) and recording gauge installed on downstream side of centre pier.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of view showing east span of Kitimat River bridge. Note very low water level (elevation 39.9) and recording gauge installed on downstream side of centre pier.
Photograph of view looking west across the Kitimat River bridge showing the west span erected and bolted, and the lower chord of the east span about halfway across the main channel.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of view looking west across the Kitimat River bridge showing the west span erected and bolted, and the lower chord of the east span about halfway across the main channel.
Photograph of aerial view of the Kitimat River bridge site looking east. The townsite camp can be seen at upper right. The building erected at left centre on the river bank is the clubhouse of the Kitimat Rod & Gun club.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of aerial view of the Kitimat River bridge site looking east. The townsite camp can be seen at upper right. The building erected at left centre on the river bank is the clubhouse of the Kitimat Rod & Gun club.
Photograph of view looking west at bridge site showing Kitimat River at elevation 45. Centre pier of permanent bridge at right with formwork for final concrete pour.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of view looking west at bridge site showing Kitimat River at elevation 45. Centre pier of permanent bridge at right with formwork for final concrete pour.
Photograph of view of Kitimat River bridge looking west. East pier in foreground showing whalers in place with sheet piling driven to grade. Center pier-right-two bearingpiles driven to required bearing. Left-sixty foot pile in place for splicing. Temporary bridge-crew completing placing rock in pier.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of view of Kitimat River bridge looking west. East pier in foreground showing whalers in place with sheet piling driven to grade. Center pier-right-two bearingpiles driven to required bearing. Left-sixty foot pile in place for splicing. Temporary bridge-crew completing placing rock in pier.