Photo showing smeltersite looking east showing progress of structural steel and aluminum cladding in potline 2 and concrete footings and pot recess flours in potline 1. Service Building, roofs are completed, substation and precast yard and storage in foreground.
Photo showing smeltersite looking east showing progress of structural steel and aluminum cladding in potline 2 and concrete footings and pot recess flours in potline 1. Service Building, roofs are completed, substation and precast yard and storage in foreground.
Photograph of aerial of the Kitimat River Delta, Alcan Plant and part of the Ocelot Operation. Alcan Plant is visible above, Kitimat River Delta below, and Ocelot is to the right.
Photograph of aerial of the Kitimat River Delta, Alcan Plant and part of the Ocelot Operation. Alcan Plant is visible above, Kitimat River Delta below, and Ocelot is to the right.
Notes
Back of photo has 2 dates, Jan 23 1985 and Jan 23 1986. The 1986 date is a sticker add on, while the 1985 date is stamped on. The 1985 date is believed to be correct.
Photograph of aerial of the Alcan Smelter and Ocelot. Alcan is above on the left with the Kitimat River delta below. Ocelot is on the right.
Notes
Back of photo has 2 dates, Jan 23 1985 and Jan 23 1986. The 1986 date is a sticker add on, while the 1985 date is stamped on. The 1985 date is believed to be correct.