Photograph of view of the 11 man bunkhouses at the back of the motel site. Roofing is now being placed. These are prefab. units - went up in 6 days from dockside. Logs are laid in the foreground.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of view of the 11 man bunkhouses at the back of the motel site. Roofing is now being placed. These are prefab. units - went up in 6 days from dockside. Logs are laid in the foreground.
N/W corner of Smelter Site, looking east. North access road in left foreground. Area for service buildings in center foreground. Cold deck pile No. 1 in right foreground. Overburden disposal ramp in background.
N/W corner of Smelter Site, looking east. North access road in left foreground. Area for service buildings in center foreground. Cold deck pile No. 1 in right foreground. Overburden disposal ramp in background.
Photograph showing the unloading of a prefabricated section of the new bunkhouse at the motel site. This section is one third of an elevan - man bunkhouse.