Photo album (cover missing) and assorted loose photos of smelter construction in the 1950's with panoramas, unidentified navy ship, haisla bridge, smelter, Caisson dock. Photo album includes aerials, potline construction, worker accommodation, power operations construction, Haisla bridge, caisson dock, dredging, transportation, and sandhill.
Photo album (cover missing) and assorted loose photos of smelter construction in the 1950's with panoramas, unidentified navy ship, haisla bridge, smelter, Caisson dock. Photo album includes aerials, potline construction, worker accommodation, power operations construction, Haisla bridge, caisson dock, dredging, transportation, and sandhill.
Notes
Photos removed from album pages and put in envelopes.
Photograph of Smelter Pot Lines. On back reads 'Pot Rooms One A,B,&C (r to l). These threee pot rooms comprise one pot line. There are two such pot lines nearing completion. When the project is completed there will be 8 pot lines or in other words 24 pot rooms, each 1200 feet long.'
Photograph of Smelter Pot Lines. On back reads 'Pot Rooms One A,B,&C (r to l). These threee pot rooms comprise one pot line. There are two such pot lines nearing completion. When the project is completed there will be 8 pot lines or in other words 24 pot rooms, each 1200 feet long.'
General view of the site looking north showing the Smelter at upper centre, and the Graving Dock and Wharf at lower centre. Taken from a helicopter on Wednesday, April 1, 1953.
General view of the site looking north showing the Smelter at upper centre, and the Graving Dock and Wharf at lower centre. Taken from a helicopter on Wednesday, April 1, 1953.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.