Negatives showing the earliest construction for the Eurocan Pulp & Paper Mill. Clearing of land and construction of dirt roads can be seen.
Notes
**IMPORTANT NOTE** - Negative slide sleeves are labelled as 2004.16.* , where * represents the item number in each series.
80001, 80003, 80004, 80006, 80011, 80013, 80017, 80045, 80047, 80052, 80054, 80058
Photographs showing general ground and aerial shots of the Ocelot methanol plant throughout its construction.
Notes
7357-(13,14,16), 80-6-(008,011), 80-7-(051,052), 80-8-(069,073), 80-9-089, 81-01-(147,148,151), 81-03-(179,183,189,200), 81-04-208, Roll 14-No4, Roll 17-(No8,19), 81-07-(380,381,384), 81-09-(441,443,448,449,450), 81-10-(481 to 485,488,498,503,504,506 to 509), 31-9A, 82-03-(820 to 824), 82-06-(953,954,956,958,963,964), 82-07-(979 to 985), 82-08-(996,1001,1004,1006,1009,1014,1018,1035,1051,1056, 1082 to 1089), 82-09-(1118 to 1124), 82-10-(1165,1167,1168,1191,1192), 85-01-(1317,1325,1330), 85-05-(1350,1353,1354), 85-06-(1355,1356)
Negatives showing large steel parts for the mill and other steel structures that were on the Eurocan site after roughly the first 1.5 years of construction.
Negatives showing large steel parts for the mill and other steel structures that were on the Eurocan site after roughly the first 1.5 years of construction.
Negatives showing the state of some of the machines and structures for the Eurocan Pulp & Paper Mill after approximately two years of site construction.
Negatives showing the state of some of the machines and structures for the Eurocan Pulp & Paper Mill after approximately two years of site construction.
Negatives showing aerials & ground images of the Eurocan Pulp & Paper Mill with visual signs of parts of the mill in operation. A couple negatives show the town of Kitimat with Eurocan in the distant background.
Negatives showing aerials & ground images of the Eurocan Pulp & Paper Mill with visual signs of parts of the mill in operation. A couple negatives show the town of Kitimat with Eurocan in the distant background.
Negatives showing the different stages of construction on the Eurocan wharf. Alcan can be seen in the background of some images. Two negatives are of Minette Bay where Eurocan has a stock pile of logs floating on the water and on barges.
Negatives showing the different stages of construction on the Eurocan wharf. Alcan can be seen in the background of some images. Two negatives are of Minette Bay where Eurocan has a stock pile of logs floating on the water and on barges.
Photo showing a BE 22-B Trench Hoe digging the trench for sewer and water lines to the family quarters at the Kitimat Construction Camp. These were prefab buildings which were completed at the rate of two daily.
Photo showing a BE 22-B Trench Hoe digging the trench for sewer and water lines to the family quarters at the Kitimat Construction Camp. These were prefab buildings which were completed at the rate of two daily.
Photo showing the muck dredged from the wharf area to provide sufficient water space for large ships dumped on these barges by the Clamshell Bucket and towed out into deep water by a small motor boat, the TD-9 dozer goes to work pushing the load off as they move along.
Photo showing the muck dredged from the wharf area to provide sufficient water space for large ships dumped on these barges by the Clamshell Bucket and towed out into deep water by a small motor boat, the TD-9 dozer goes to work pushing the load off as they move along.