Negatives showing large steel parts for the mill and other steel structures that were on the Eurocan site after roughly the first 1.5 years of construction.
Negatives showing large steel parts for the mill and other steel structures that were on the Eurocan site after roughly the first 1.5 years of construction.
Negatives showing the state of some of the machines and structures for the Eurocan Pulp & Paper Mill after approximately two years of site construction.
Negatives showing the state of some of the machines and structures for the Eurocan Pulp & Paper Mill after approximately two years of site construction.
Photo depicts the dredge and dragline excavating the channel from the dock to deep water, a truck dumping gravel for the foundation blanket into the bottom of a dump scow. The view looks toward the construction site for the permanent wharf from the south dike of the graving dock, crew bunkhouses of Smeltersite in the background.
Photo depicts the dredge and dragline excavating the channel from the dock to deep water, a truck dumping gravel for the foundation blanket into the bottom of a dump scow. The view looks toward the construction site for the permanent wharf from the south dike of the graving dock, crew bunkhouses of Smeltersite in the background.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-320. Hal Whiting Collection 985.65.211
Negatives showing the earliest construction for the Eurocan Pulp & Paper Mill. Clearing of land and construction of dirt roads can be seen.
Notes
**IMPORTANT NOTE** - Negative slide sleeves are labelled as 2004.16.* , where * represents the item number in each series.
80001, 80003, 80004, 80006, 80011, 80013, 80017, 80045, 80047, 80052, 80054, 80058