Looking west aerial photograph showing main camp, married quarters, Delta King, hydraulic fill, recreation building, , Hospital, Power Plant, Saw Mill and Water tank
Looking west aerial photograph showing main camp, married quarters, Delta King, hydraulic fill, recreation building, , Hospital, Power Plant, Saw Mill and Water tank
Photograph of Smeltersite looking east.. Foreground, perforated water pipe for ground water ditch. Middleground: Pre-cast concrete yard with storage stacks at right. Structural steel partially complete in Service Buildings Lines D to M. Footings for Potline 2 at right.
Photograph of Smeltersite looking east.. Foreground, perforated water pipe for ground water ditch. Middleground: Pre-cast concrete yard with storage stacks at right. Structural steel partially complete in Service Buildings Lines D to M. Footings for Potline 2 at right.
Photograph of Smeltersite. Taken from the top deck of the 'Delta King' showing the Rec. Hall and Fred?? top at left. This was rior to the closing of Helen's Cafe. Note pump and ?? ?ground. Pump used to keep water out of coffer dam around Delta King. Seven ?? rainwater combined with high tide to float the ship, breaking all steam lines ???.
Photograph of Smeltersite. Taken from the top deck of the 'Delta King' showing the Rec. Hall and Fred?? top at left. This was rior to the closing of Helen's Cafe. Note pump and ?? ?ground. Pump used to keep water out of coffer dam around Delta King. Seven ?? rainwater combined with high tide to float the ship, breaking all steam lines ???.
Photograph - aerial view of graving dock showing rough outline of excavation, Access Road into Dock at North West corner, and shovels, double handling base material.
Photograph - aerial view of graving dock showing rough outline of excavation, Access Road into Dock at North West corner, and shovels, double handling base material.
Album containing photos and clippings of the Kitimat Youth Soccer Association Fields development. Official Sod Turning Ceremony was Thurs. July 1, 1993 (Phase 1), Clearing/Grading July 1995 (phase 2), and Full Field Soccer completed Spring 1997.
Album containing photos and clippings of the Kitimat Youth Soccer Association Fields development. Official Sod Turning Ceremony was Thurs. July 1, 1993 (Phase 1), Clearing/Grading July 1995 (phase 2), and Full Field Soccer completed Spring 1997.
Notes
Album dismantled and contents sorted into envelopes for safer archival storage. Album used an adhesive which was not ideal for the preservation of the photos. Album pages copied and put into archival storage.
10 slides featuring image of Kitimat in 1980. Slides include images of the Safety Building, hospital, an aerial, Moore Creek waterfall, golf course, centennial park, Lakelse Lake, Alcan Office, and Kitimat River.
10 slides featuring image of Kitimat in 1980. Slides include images of the Safety Building, hospital, an aerial, Moore Creek waterfall, golf course, centennial park, Lakelse Lake, Alcan Office, and Kitimat River.