Aerial view of the smelter area looking north. Note rectifier buildings mainly closed in and roofing nearing completion. Potline footings are begining to extend east of the centre passageway.
Aerial view of the smelter area looking north. Note rectifier buildings mainly closed in and roofing nearing completion. Potline footings are begining to extend east of the centre passageway.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Donated by Meg Walker, granddaughter of John and Marjorie Nute, on October 11th 2022.
Scope and Content
Photograph of the Kemano townsite, taken from the side of Mt. Dubose.
Notes
Taken by Rev. John Nute, who was the pastor at Kitimat Presbyterian Church in summer 1977.
Written on back: "Kemano - Power station 3 1/2 hrs. by boat from Kitimat. Power station is entirely in the Mt. from which we took this picture."