Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Photograph of the smelter site, smaller buildings to the bottom left; larger buildings to the right;mountains in the background; and trees in the front.
Photographs taken by Gordon Lee donated to the museum by his daughter Michelle Simeoni.
Scope and Content
Photograph of the smelter site, smaller buildings to the bottom left; larger buildings to the right;mountains in the background; and trees in the front.
Photograph showing an L shaped building in the foreground, industrial buildings in the bottom half of the photo and landscape and trees in the background.
Photographs taken by Gordon Lee donated to the museum by his daughter Michelle Simeoni.
Scope and Content
Photograph showing an L shaped building in the foreground, industrial buildings in the bottom half of the photo and landscape and trees in the background.