Looking north from sandhill (elev. 640 +) to site of permanent bridge center left, Townsite camp center right edge of photo, and Townsite ridge left to right.
Looking north from sandhill (elev. 640 +) to site of permanent bridge center left, Townsite camp center right edge of photo, and Townsite ridge left to right.
Photograph looking downstream from the west side of the park near the Kitimat River Bridge showing river within 1' of maximum flood on Nov. 3. Note boom of dragline in centre of picture.
Photograph looking downstream from the west side of the park near the Kitimat River Bridge showing river within 1' of maximum flood on Nov. 3. Note boom of dragline in centre of picture.
Kitimat General Hospital : With an ultimat capacity of 219 beds, this magnificent building, costing $3,200,000, was opened March 19th 1960, by the Honorable Eric Martin, Provincial Minister of Health Services and Hospital Insurance.
Kitimat General Hospital : With an ultimat capacity of 219 beds, this magnificent building, costing $3,200,000, was opened March 19th 1960, by the Honorable Eric Martin, Provincial Minister of Health Services and Hospital Insurance.