Looking north from sandhill (elev. 640 +) to site of permanent bridge center left, Townsite camp center right edge of photo, and Townsite ridge left to right.
Looking north from sandhill (elev. 640 +) to site of permanent bridge center left, Townsite camp center right edge of photo, and Townsite ridge left to right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Flood looking upstream of Neighbourhood C Drainage Canal from approx. station 25/00. Note silt etc. in canal. Section of canal in immediate foreground was cut to shape just prior to the flood.
Flood looking upstream of Neighbourhood C Drainage Canal from approx. station 25/00. Note silt etc. in canal. Section of canal in immediate foreground was cut to shape just prior to the flood.