Photograph of Potline 2 looking south west from roof of the forge shop. Note purlin clips welded for roof deck. Column forms in place. Concrete being poured for top lift air duct entrance Potroom 2B. Rectified building #102 at right.
Photograph of Potline 2 looking south west from roof of the forge shop. Note purlin clips welded for roof deck. Column forms in place. Concrete being poured for top lift air duct entrance Potroom 2B. Rectified building #102 at right.
Photo showing view in potroom 2B looking north east, showing concrete being placed for walls of lunch and restrooms building 2E, storage bin foundations and centre passageway wall in left foreground.
Photo showing view in potroom 2B looking north east, showing concrete being placed for walls of lunch and restrooms building 2E, storage bin foundations and centre passageway wall in left foreground.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Photo showing inside of Casting building, on left is conveyor shute, conveyor for ingots and table for ingots to be stacked and wrapped for shipping on the right, holding bay.
Photo showing inside of Casting building, on left is conveyor shute, conveyor for ingots and table for ingots to be stacked and wrapped for shipping on the right, holding bay.