Photo showing view in potroom 2B looking north east, showing concrete being placed for walls of lunch and restrooms building 2E, storage bin foundations and centre passageway wall in left foreground.
Photo showing view in potroom 2B looking north east, showing concrete being placed for walls of lunch and restrooms building 2E, storage bin foundations and centre passageway wall in left foreground.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Photo showing inside of Casting building, on left is conveyor shute, conveyor for ingots and table for ingots to be stacked and wrapped for shipping on the right, holding bay.
Photo showing inside of Casting building, on left is conveyor shute, conveyor for ingots and table for ingots to be stacked and wrapped for shipping on the right, holding bay.