Photograph of aerial photograph looking east toward neighbourhood A with the City Centre clearing in the right-hand foreground and neighbourhood A-IV clearing in the centre foreground.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of aerial photograph looking east toward neighbourhood A with the City Centre clearing in the right-hand foreground and neighbourhood A-IV clearing in the centre foreground.
Photograph of aerial view looking east across neighbourhood A-III and A-I. Note in upper left centre a portion of the concrete walks already constructed, which eventually will lead to Kingfisher underpass. Also note contrast between landscaped areas and those surrounding the houses now under construction. Gyrfaclon street in centre. Nechako Centre and School visible at upper left. Nechako school has protables outside.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of aerial view looking east across neighbourhood A-III and A-I. Note in upper left centre a portion of the concrete walks already constructed, which eventually will lead to Kingfisher underpass. Also note contrast between landscaped areas and those surrounding the houses now under construction. Gyrfaclon street in centre. Nechako Centre and School visible at upper left. Nechako school has protables outside.
Photograph of #1 Guest House showing amdeck roofing in place. Two men are working on the roof, and two men are working on another structure on the left. Building material is laid on the ground around.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of #1 Guest House showing amdeck roofing in place. Two men are working on the roof, and two men are working on another structure on the left. Building material is laid on the ground around.
Photograph of smeltersite looking east. Service building area in middleground with pre-cast wall panels in position. Pre-cast concrete yard in foreground.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of smeltersite looking east. Service building area in middleground with pre-cast wall panels in position. Pre-cast concrete yard in foreground.
Photograph of smeltersite looking east. Foreground, perforated concrete pipe for ground water ditch. Middleground, pre-cast concrete yard with storage stacks at right. Structural steel partially complete in service buildings lines D to M. Footings for pot line 2 at right.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of smeltersite looking east. Foreground, perforated concrete pipe for ground water ditch. Middleground, pre-cast concrete yard with storage stacks at right. Structural steel partially complete in service buildings lines D to M. Footings for pot line 2 at right.
Photograph of smeltersite looking east, showing partially completed service buildings at left and work proceeding on rectifier buildings in foreground. Temporary covers for the center passageway buildings can be seen beyond the west half of the pot rooms.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of smeltersite looking east, showing partially completed service buildings at left and work proceeding on rectifier buildings in foreground. Temporary covers for the center passageway buildings can be seen beyond the west half of the pot rooms.
Photograph of view looking west at bridge site showing Kitimat River at elevation 45. Centre pier of permanent bridge at right with formwork for final concrete pour.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of view looking west at bridge site showing Kitimat River at elevation 45. Centre pier of permanent bridge at right with formwork for final concrete pour.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Smelter Site looking East. K. C. Administration Building left foreground. Ground water ditch in front of pre-cast Concrete Yard. Service Building area behind with pre-cast panels in place for forge shop and warehouse. Fooding Forms and warehouse. Footing Forms prepared for Pot Room 2 C at right.
Smelter Site looking East. K. C. Administration Building left foreground. Ground water ditch in front of pre-cast Concrete Yard. Service Building area behind with pre-cast panels in place for forge shop and warehouse. Fooding Forms and warehouse. Footing Forms prepared for Pot Room 2 C at right.