N/W corner of Smelter Site, looking east. North access road in left foreground. Area for service buildings in center foreground. Cold deck pile No. 1 in right foreground. Overburden disposal ramp in background.
N/W corner of Smelter Site, looking east. North access road in left foreground. Area for service buildings in center foreground. Cold deck pile No. 1 in right foreground. Overburden disposal ramp in background.
Aerial view of the smelter area looking north. Note rectifier buildings mainly closed in and roofing nearing completion. Potline footings are begining to extend east of the centre passageway.
Aerial view of the smelter area looking north. Note rectifier buildings mainly closed in and roofing nearing completion. Potline footings are begining to extend east of the centre passageway.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.